Saturday, July 26, 2008

Construction

BLR Airport under construction
The image “http://upload.wikimedia.org/wikipedia/commons/thumb/b/b2/BLR.jpg/180px-BLR.jpg” cannot be displayed, because it contains errors.

The new airport was originally planned to accommodate 3.5 million passengers a year, but this has now been redesigned to handle 12 million passengers. The redesign resulted in an increase in the size of the terminal, number of aircraft stands, new taxiway layouts and supporting infrastructure.

A plan is also being processed for a direct rail service from Bangalore Cantonment Railway Station to the Basement Rail terminal at the airport. Access on the National Highway 7 is being widened to a six lane expressway, with a 3 feet (0.91 m) boundary wall, as construction moves ahead.

A new expressway was planned to connect the airport to the city's Ring Road. The expressway, expected to be a tolled road, would begin at Hennur on the Outer Ring Road.However the State government, citing a study report of the National Highway Authority of India (NHAI), has told the Karnataka High Court that the proposed super expressway connecting the Outer Ring Road and Bangalore International Airport (BIA) is not feasible.

No comments: